Back to Stages and Layher structuresSpecialized capability · 04
FOH, towers and bridges
Single- or multilevel FOH structures, delay towers, followspot positions and pedestrian bridges.
Planning · Installation · OperationA solution sized for the real operation.
We integrate foh, towers and bridges into the production plan, accounting for venue conditions, schedules, technical interfaces and the needs of every team involved.
Delay and followspot towers
Temporary bridges and circulation
From technical review to live operation.
Technical review
We review the venue, schedule, rider, capacity and interfaces with the rest of the production.
Engineering and planning
We define equipment, positions, resources, sequences and contingencies before arriving on site.
Installation and testing
Our team installs, integrates and verifies the system under real operating conditions.
Operation and support
We remain coordinated with production to respond throughout rehearsals, show and strike.
